Speaking of Patch Panel Terminations.. |
|
|
Re: the thread with the patch panel woes. I was asked to fix an open at
the patch panel jack. It shows open at the patch panel with my
DSP-2000, so i'm going to have to repunch it down. But I've never had
to work on a patch panel with 48 ports, and in this case most of the
cat5s are covering up the bad jack. I'm wondering if it's really a Good
Idea to even mess around with that port, and just repull another run and
terminate on the same vicinity.
Funny, but there's a different patch panel within a few feet of the
drop, but the contractor(when the bldg was built) decided to run all the
drops in that room to another patch panel fifty feet away. It might be
because of the floor being raised, and it was easier to run it thru the
raised floor and conduits. But in any case, my whole problem is that
the density of the cables behind the patch panel is so great that it's a
real witch of a job. And they're going to bug me next week about it,
because it's a workstation in a classroom and they want if fixed asap.
Oh, well..
--
@@F@r@o@m@@O@r@a@n@g@e@@C@o@u@n@t@y@,@@C@a@l@,@@w@h@e@r@e@@
###Got a Question about ELECTRONICS? Check HERE First:###
http://users.pandora.be/educypedia/electronics/databank.htm
My email address is whitelisted. *All* email sent to it
goes directly to the trash unless you add NOSPAM in the
Subject: line with other stuff. alondra101 <at> hotmail.com
Don't be ripped off by the big book dealers. Go to the URL
that will give you a choice and save you money(up to half).
http://www.everybookstore.com You'll be glad you did!
Just when you thought you had all this figured out, the gov't
changed it: http://physics.nist.gov/cuu/Units/binary.html
@@t@h@e@@a@f@f@l@u@e@n@t@@m@e@e@t@@t@h@e@@E@f@f@l@u@e@n@t@@ |
|
Dmitri(Cabling-Design.com
Guest
|
Posted:
Sun Sep 11, 2005 1:07 am Post subject:
Re: Speaking of Patch Panel Terminations.. |
|
|
Watson A.Name - \"Watt Sun, th wrote:
| Quote: | I'm wondering if it's really a
Good Idea to even mess around with that port, and just repull another run
and terminate on the same vicinity.
|
It is definitely going to be a bitch of a job on a tightly packed panel.
But if you have to do it anyways, be very careful not to disturb any other
cables. Un-tie what's possible and try to push bundles to the side that's
not covering the connector. Also, get yourself needle nose pliers. Those
are indispensable when pulling the wires out of an IDC contact. Radio
Shack variety is just fine, no need for high-end extra long ones, although
those are oh-so-good ;-). Before you attempt to re-terminate, examine the
jack from the front. Sometimes the pins get bent or damaged. If so it
wouldn't make much sense to re-terminate, obviously.
Good luck!
--
Dmitri Abaimov, RCDD
http://www.cabling-design.com
Cabling Forum, color codes, pinouts and other useful resources for
premises cabling users and pros
http://www.cabling-design.com/homecabling
Residential Cabling Guide
-------------------------------------
##-----------------------------------------------#
Article posted with Cabling-Design.com Newsgroup Archiv
http://www.cabling-design.com/forum
no-spam read and post WWW interface to your favorite newsgroup -
comp.dcom.cabling - 2457 messages and counting
##-----------------------------------------------## |
|